Custom Pylon Signs & Tenant Directories
Custom illuminated entrance signs and multi-tenant directories for dealerships, shopping centers and commercial properties. Our team plans, designs and manufactures your sign to the agreed dimensions, tenant layout, lighting and finish.
MOQ: 1 set · Free design support · Production: 7–15 days · 1-year warranty.
Send site photos, approximate dimensions, tenant layout and destination. First reply within 8 hours by WhatsApp or email; final design and quotation follow review.
EXW, FOB, CIF or DDP by quotation. Local foundations and on-site installation are arranged by your project team.
See a real dealership pylon: drawing to lighting check →
Water Fashion Plaza, Dalian: installed entrance pylon and tenant directory. Explore the project
From drawing to illuminated sign
Multi-brand dealership pylon: workshop views
These photographs show the same automotive directory unlit and during a workshop lighting check. Separate brand panels organise the display, while the header and lower graphics complete the identity. This is a manufacturing reference, rather than an installed-site photograph.


Read the dealership pylon drawing and production case
Project drawing example
- Overall height
- 4,000 mm
- Overall width
- 1,500 mm
- Cabinet depth
- 200 mm
Dimensions shown on the supplied drawing for this example. Your sign dimensions, panel layout, electrical supply and mounting interface are specified for your own site.
View the project elevation drawing

Project photographs
Pylon and totem signs in different settings
Compare tenant directories, entrance identification and directional totems. Each photograph shows a particular configuration; dimensions and materials are confirmed separately for a new quotation.

Retail tenant directory
A freestanding directory with stacked tenant faces and a separate site identity at the top.

Sports park and parking
Two display faces combine activity graphics and parking directions. The installation photograph also shows the base interface.

Residential entrance identity
Raised lettering, decorative side details and a display panel give this entrance sign a different visual hierarchy.

Illuminated parking totem
A workshop lighting check shows illuminated parking graphics and a warm perimeter detail before site installation.

Logistics site directions
Separate truck, warehouse and office directions make the sign useful at a decision point, beyond displaying a company name.
Prepare your quotation
Which configuration fits your site?
Send the location, approximate height and width, number of faces, artwork and lighting preference. Include site photos and identify details still awaiting local confirmation.
Get a custom pylon sign quoteUse the site information checklistBefore you request a quote
Plan the pylon from structure to delivery
ZYD can plan, design, fabricate, pack and transport the sign. On-site installation is not included. Confirm the supply scope and local site responsibilities in writing before production.
Minimum order
1 set
Design support
Free design by our designers
Typical production
7–15 days
Warranty
1 year
Confirm the production schedule with the approved drawings and order scope. Design review and transport time are scheduled separately from production.
Structure and site inputs
Provide overall height and width, number of faces, panel layout, site location and any available structural requirements. Frame, base plate, anchors and foundation interfaces require project-specific review; local engineering acceptance and approvals must be agreed with the site team.
Shipping and packing
Confirm whether the sign ships assembled or in sections, packed dimensions, shipment method and destination access. Request a packing proposal and identify unloading or lifting equipment needed at the delivery point.
Assembly and maintenance
Agree the section joints, assembly sequence, connection details, cable routes and service-panel access on the drawings. Confirm who assembles and lifts the sign, and which instructions and hardware the supplier will provide.
Lighting and supply boundary
Specify illuminated panels or letters, power location, finish and access for servicing. Ask the quote to identify the frame, cladding, faces, lighting, drivers and accessories included; foundations, ground works, site installation and electrical connection are excluded from ZYD supply and arranged locally.
From free design to drawing approval
- Send your logo or reference, approximate dimensions, quantity, site photographs and delivery destination. Unknown details can be discussed with our designers.
- Our designers prepare a free design for review. Check the artwork, dimensions, colours, lighting and proposed mounting arrangement with your project team.
- Confirm the final drawing and written supply scope before fabrication. For pylon signs, coordinate site-dependent structural and foundation interfaces with your local team.
- Agree the production schedule, packing and delivery arrangements for the approved order. Typical production takes 7–15 days; on-site installation is not included.
1-year warranty and after-sales contact
If an issue occurs, contact our team with the order reference, a description and clear photos or video. We will review the issue and discuss the appropriate next steps. Confirm warranty coverage and any parts, labour or transport arrangements in the order terms. On-site installation and local site work are not included.
Start with what you have
Send site photos or a plan, approximate height and width, quantity and number of faces, artwork, lighting preference, site city/country and delivery destination. Unknown details can be marked for review. Request fabrication, accessories, packing and freight as separate quote lines, with exclusions identified.
Submit a pylon sign briefChoose a pylon sign when the entry must be identified from a distance, above roadside obstacles, or across multiple approach lanes. Choose a monument sign when a lower, wider presence tied to the site and landscape suits the brand better. The decision follows the approach distance, permitted height, site context, and message hierarchy, not a fixed rule.
How are large pylon signs engineered for wind load?
Wind resistance is a site-specific engineering question, not a fixed specification. Confirm the design criteria and responsibility for structural calculations and foundation design with the project team. The fabrication drawing, base plate, anchors and electrical entry must agree with the approved site design. The illumination and power components are selected and reviewed against the confirmed exterior application.
Which materials should an outdoor monument sign use?
Material selection starts with the finish the brand needs, the exposure of the site, and how the structure will be fabricated and maintained. Common routes include galvanized sheet, 201 and 304 stainless steel, and aluminum plate, each followed by a specified coating or finish system. For a fuller comparison of stainless and coated-steel routes, review our material guide before sending a brief.
What sizes can you manufacture?
Overall dimensions are confirmed against the project drawing, the viewing distance, and the site, so there is no responsible one-size answer. Share the approximate height and width, the approach distance, and any permitted-height constraint, and the engineering review will confirm the structural approach before production. Recent landmark projects give a practical sense of what the factory builds at scale.
When does a pylon or monument sign need coordinated engineering?
Any tall or site-integrated structure benefits from an early engineering conversation: wind exposure, foundation or ground interface, power routing, service access, and local review requirements all belong in the brief. Projects that combine entry identity with wider wayfinding needs are often delivered together as one coordinated program.
Specifications with selection logic
Each option below is a decision input. Confirm the site, finish, and fabrication requirement with the project brief before production.
Material direction
- • Galvanized sheet with a specified coating system for painted structures
- • 201 or 304 stainless steel when a stainless appearance is required
- • Aluminum plate for lighter structural sections
Finish direction
- • Powder coating in specified RAL colors
- • Automotive-grade paint where the brand finish demands it
- • Brushed or mirror stainless finish as an exposed-metal route
Structure & mounting
- • Internal reinforced frames for larger faces
- • L-shape or U-shape mounting brackets
- • Flush-mount installation where the site allows
- • Project-specific wind load review for tall structures
Illumination & durability
- • LED modules selected for the project specification
- • Power supplies selected for the project specification
- • Environmental rating reviewed for the exterior application
- • 1-year warranty; coverage confirmed in the order terms
Factory Advantage
Direct manufacturing from our 20,000sqm base in Dalian, established in 2006, keeps every weld and finish under one quality-control process.

From design to dispatch
Planning, fabrication, packing and shipping
ZYD can plan and design the signage, manufacture the approved sign package, and arrange packing and transport. EXW, FOB, CIF and DDP options are available by quotation for the agreed destination or port.
On-site installation is not included. Arrange the local installer, foundation works, lifting and electrical connection with your project team.
View packing photos and delivery scopeFrequently asked questions
Do you offer free design and drawing confirmation?
Yes. Our designers provide free design support. Share your artwork or reference, dimensions, quantity and site information. Review the design and confirm the final drawing, lighting, finish and supply scope before fabrication. Site-dependent interfaces must be coordinated with the local project team.
What warranty and after-sales support do you provide?
The warranty is 1 year. Contact our team with the order reference, issue description and photos or video so we can review the problem and discuss the next steps. Warranty coverage and any parts, labour or transport arrangements should be confirmed in the order terms. On-site installation is not included.
What is the difference between a pylon sign and a monument sign?
A pylon sign is a tall, freestanding identification structure usually chosen when the sign must be read from a distance or above surrounding objects. A monument sign is a lower, broader structure integrated with the site and landscape. The right choice depends on approach distance, permitted height, site context, and the message hierarchy.
Do you provide wind load calculations and foundation specifications?
Provide the site location, dimensions and local structural criteria with the brief. Agree who supplies structural calculations, foundation design and local approval services. Fabrication drawings and anchor interfaces must be coordinated with the responsible local engineer; these services are not automatically included in every quotation.
What is the standard lead time for pylon and monument signs?
The MOQ is 1 set. Typical production lead time is 7–15 days. Confirm the production schedule with the approved drawings, dimensions, finish, lighting, quantity and packing requirements. Design review, local engineering and freight are scheduled separately. On-site installation is not included.
Planning an entry sign project?
Send the site location, approximate dimensions, artwork, and quantity for a project-specific review.
Before ordering: prepare your pylon sign site information
Related case study: Water Fashion Plaza, Dalian — the freestanding pylon sign that identifies the site entrance.
