Start Your Project
Consult with our engineering team for free 3D mockups and factory-direct pricing.
Project Inquiry
Direct Communication
Factory Location
No. 18, Industrial Zone, Ganjingzi District, Dalian, Liaoning, China
Planning, fabrication, packing and delivery
We can plan and design your signage, manufacture it and arrange packing and transport. EXW, FOB, CIF and DDP options are quoted for your destination or port. On-site installation is not included.
View packing photos and delivery scopeWhat to send for a quotation
A signage quotation is built from the project, not from a product name, so the fastest route to a comparable price is a brief that states what is already fixed. A supplier can then price the same scope instead of guessing, and the open questions stay visible as open questions.
Send whatever exists today. Rough dimensions, a photograph of the wall or the ground, and a logo file are enough to start: the drawing set is developed with you during the technical consultation, and the free 3D mockup is produced before fabrication so the intended appearance can be reviewed first.
Minimum order is 1 set and typical production lead time is 7–15 days from the point the artwork and the drawings are agreed, so an incomplete brief delays the start of production rather than the quotation. The FAQ answers the questions that arrive most often, and the guides cover material, illumination and procurement decisions in more detail.
Project brief checklist
- Artwork or logo file, with brand colour references
- Sign type, or the site and message if the type is still undecided
- Approximate overall dimensions, letter heights and quantity
- Indoor or outdoor placement, and the mounting surface
- Illumination preference: front-lit, halo-lit, non-illuminated, or undecided
- Material and finish direction, if one has been specified
- Photographs of the site and any access constraints
- Site city and country, delivery destination, and target timing
Unknown items are useful too: mark them for clarification and they are answered in the technical review rather than filled in with an assumption.
